This section provides a database of municipal project proposals submitted by the most advanced and motivated Covenant signatories. The database has been developed to increase transparency of local investments and enhance match-making opportunities among the local and regional authorities, local stakeholders as well as potential national and international financing institutions, thus facilitating materialization of SEAP/SECAP measures of CoM East signatories.

The proposals are combined in the national project pipelines and, depending on each country, cover the following sectors:

  • Climate
  • District heating
  • Energy efficient buildings
  • Energy efficient transport
  • Renewable energy
  • Street lighting
  • Waste management

In each sector, the downloadable forms provide a short summary of each municipal project proposal: information on the municipality including the contact persons, pilot facilities or objects, technical aspects of the proposed measures, needed investments and expected energy saving and GHG emission reduction benefits.

Information is mainly available in national and English languages. Exceptions are project proposals of Belarus and Ukraine, which are presented in Russian and Ukrainian languages accordingly.

For further information on the project proposals please contact either the CoM East National Office or directly the applicant municipalities.

EN page 0001

RENEWABLE ENERGY

RENEWABLE ENERGY (8)

Friday, 03 April 2020 14:19

Vanadzor

Written by

Installation of a grid‐ties PV system with an installed (peak) capacity of 31.24 kW on the roof of the city hall of Vanadzor municipality.

AM   EN

Friday, 03 April 2020 14:18

Tashir

Written by

Installation of a grid‐tied PV system with an installed (peak) capacity of 8.87 kW on the roof of the city hall of Tashir municipality.

AM   EN

Friday, 03 April 2020 14:17

Sisian

Written by

Installation of a grid‐tied PV system with an installed (peak) capacity of 7.81 kW on the roof of the cultural center of Sisian municipality.

AM   EN

Friday, 03 April 2020 14:16

Sisian

Written by

Installation a grid‐tied PV system with an installed (peak) capacity of 14.2 kW on the roof of the city hall of Sisian municipality.

AM   EN

Friday, 03 April 2020 14:15

Kapan

Written by

Installation a grid-tied PV system with an installed (peak) capacity of 27.6 kW on the roof of the city hall of Kapan municipality.

AM   EN

Friday, 03 April 2020 13:52

Hrazdan

Written by

Installation of a grid‐tied PV system with an installed (peak) capacity of 25.56 kW on the roof of the city hall of Hrazdan municipality.

AM   EN

Monday, 30 March 2020 11:38

Gavar

Written by

Installation of 7 grid-tied PV systems with an installed (peak) capacity of 43.5 kW on the roofs of 7 municipal objects of Gavar town.

AM   EN

Friday, 27 March 2020 12:05

Alaverdi

Written by

Installation of a grid-tied PV system with an installed (peak) capacity of 31.95 kW on the roof of the house of culture of Alaverdi municipality.

AM    EN